Professional services for construction, engineering and infrastructure.
Harcon Solutions
Not sure which service is right for you?

Every requirement is different. Tell us what you are looking to achieve and we will help identify the appropriate expertise, assurance and support for your project or organisation.

Talk to a consultant0800 3102 008 Talk to Harcon
Railway, construction and engineering
Railway Asset Protection & Third Party InterfaceManaging third party projects that interface with the operational railway, from early Asset Protection engagement and design through to construction planning, assurance and site delivery. Railway Planning & AssurancePlanning and assurance for access, possessions, Safe Systems of Work and Any Line Open arrangements, from early planning through to site delivery. Construction & Engineering AssuranceConstruction and engineering management, design coordination, CEM and CRE support, temporary works oversight and practical delivery assurance. CDM & Principal Contractor AssuranceCDM governance, duty holder support and Principal Contractor management and assurance throughout project delivery, including defined Principal Contractor’s Representative appointments.
Systems, assurance and support
HSQE & Management SystemsCompetent health and safety support, wider HSQE consultancy, integrated management systems, ISO support, auditing and organisational assurance. Railway Industry AssuranceRISQS and Network Rail Principal Contractor Licensing, including organisational readiness, management systems and assurance. Retained Professional ServicesRetained consultancy, professional resourcing and specialist appointments providing additional expertise, capacity and continuity to organisations, projects and programmes. All Professional ServicesExplore Harcon’s complete range of consultancy, management, assurance and professional resourcing services in one place.
Company
About Harcon Case studies Insights
Talk to Harcon Call 0800 3102 008
Works taking place alongside operational railway infrastructure
Network Rail interface

Railway Asset Protection
& Third Party Interfaces

For third party developments and construction schemes that interface with the operational railway. We provide specialist railway interface consultancy, managing and coordinating Network Rail Asset Protection requirements from early project development and design through to construction and delivery.

Experience across multiple Network Rail regions Support from early development through to delivery Construction and engineering assurance capability
When Asset Protection applies

Does this apply to your project?

Network Rail Asset Protection requirements can apply where third party works have the potential to affect railway infrastructure, operations or access. Early identification of the interface helps ensure the appropriate engagement, engineering and construction assurance arrangements are established before works progress.

Your project is close to the railway boundaryConstruction activity, structures, excavations or earthworks that could affect railway infrastructure may require Asset Protection engagement.
You are working near railway electrification infrastructureCranes, piling rigs, MEWPs, scaffolding and other plant or temporary works may introduce additional requirements where works are close to overhead line equipment or other railway infrastructure.
You require access over, under or through railway landAccess affecting Network Rail land or infrastructure needs to be identified, agreed and appropriately coordinated.
Your works could affect railway infrastructure or operationsGround movement, vibration, drainage, lifting operations, temporary works and other construction activities may require assessment and assurance.
Understanding ASPRO

What ASPRO is, and why it matters

Network Rail Asset Protection (ASPRO) provides the framework through which third party works that could affect the operational railway are assessed, coordinated and assured. Its purpose is to protect railway infrastructure and operations while enabling third party projects to be developed and delivered safely.

The Asset Protection interface can extend throughout the project lifecycle, from early feasibility and design through engineering assurance, construction planning and delivery. Requirements will vary according to the nature, location and potential impact of the proposed works, making early engagement particularly important.

Why early engagement matters

Railway interface requirements identified late can affect design, programme, construction methodology and cost. Establishing the required Asset Protection, engineering and construction assurance arrangements early allows these requirements to be incorporated into project planning before key decisions and commitments are made.

Harcon provides specialist railway interface consultancy throughout this process, working alongside client, design and delivery teams to coordinate Network Rail requirements and translate them into practical actions that can be managed through the project.

Scope

How we support your project

From early engagement with Network Rail through design, assurance and construction delivery, we manage and coordinate the Asset Protection interface in collaboration with the wider project team. Our support can include:

  • Network Rail interface management. Coordinating engagement, meetings, actions and project requirements.
  • BAPA and APA coordination. Supporting the project team through the technical and project requirements associated with the relevant agreement.
  • Asset Protection submissions. Coordinating and managing the information required for Network Rail review and acceptance, including designs, method statements, work package plans and construction methodologies.
  • Design and engineering assurance. Coordinating designs against applicable Network Rail requirements and assurance processes.
  • Construction planning and assurance. Aligning methodologies, work packages and delivery arrangements with railway interface requirements.
  • Risk and monitoring requirements. Coordinating appropriate controls for matters such as ground movement, vibration, drainage and construction activity.
  • Railway access and interface planning. Coordinating access requirements and specialist rail support where required.
  • Delivery stage interface management. Maintaining the Asset Protection interface as the project progresses through construction and completion.

Our role is to maintain a clear and coordinated interface between the project team and Network Rail, ensuring requirements are identified, understood and managed at the appropriate stage while supporting effective project delivery.

The agreement

Understanding BAPA and APA requirements

Depending on the nature, complexity and potential impact of the proposed works, Network Rail may require a Basic Asset Protection Agreement (BAPA) or an Asset Protection Agreement (APA).

The appropriate agreement is determined through engagement with Network Rail. Identifying the likely requirements early helps establish the necessary assurance arrangements, responsibilities, programme allowances and associated costs.

Typically less complex works

BAPA

Generally used for relatively straightforward works or interventions where the potential impact on railway infrastructure and operations is limited.

  • Proportionate engineering and construction assurance.
  • Defined Asset Protection requirements and responsibilities.
  • Network Rail review, coordination and cost recovery arrangements.
Typically more complex works

APA

Generally used for more substantial or complex projects requiring detailed arrangements to manage the interface with railway infrastructure and operations.

  • More extensive engineering, construction and operational assurance.
  • Defined responsibilities, risk allocation and commercial arrangements.
  • Coordination of Network Rail requirements throughout project delivery.
Early considerations

Understanding the programme and cost implications. Both agreements can involve Network Rail cost recovery. Early engagement allows the anticipated assurance activities, associated costs and programme requirements to be considered before significant project commitments are made.

Project lifecycle

From early engagement through to delivery

Every project is different, but an effective railway interface follows a number of common stages. Harcon supports clients throughout the Asset Protection process, coordinating requirements as the project develops from early engagement through to construction and close out.

1

Initial project review

We establish the nature of the proposed works, the railway interface and the likely Asset Protection requirements, helping identify the appropriate next steps.

2

Early engagement with Network Rail

We support early engagement with Network Rail Asset Protection, establishing the interface and coordinating the information required as the project develops.

3

Asset Protection submissions and assurance

We coordinate the information required for Network Rail review and acceptance, including designs, method statements, work package plans, construction methodologies and supporting assurance information.

4

Agreement and project requirements

We support the coordination of the applicable Asset Protection agreement and associated requirements, ensuring responsibilities, assurance activities and programme considerations are understood by the project team.

5

Design and construction planning

We work alongside designers, engineers and delivery teams to coordinate railway requirements through design development, construction methodology, temporary works, monitoring, access and other project specific assurance arrangements.

6

Construction delivery and close out

Our involvement continues through construction, coordinating the railway interface, supporting delivery stage assurance and managing outstanding requirements through to completion and close out.

Continuity from early engagement through to delivery
Why early engagement matters

Managing railway interface risk early

Railway interfaces can introduce engineering, construction and operational requirements that materially affect design, methodology, programme and delivery. Identifying and managing these requirements early allows appropriate controls and assurance arrangements to be incorporated before key project decisions are made.

Programme
Late identification of railway requirements can affect programme, access arrangements and construction sequencing, potentially introducing constraints at critical stages of delivery.
Design & methodology
Network Rail requirements can influence permanent works design, temporary works and construction methodology. Early coordination reduces the risk of avoidable redesign or changes later in the project.
Safety & operational risk
Works interfacing with the operational railway require appropriate controls for risks associated with railway infrastructure, operations, plant, access and construction activity.
Project & commercial risk
Unplanned assurance requirements, additional controls, changes to methodology or delayed approvals can introduce additional cost and affect contractual and project commitments.
Why Harcon

Specialist expertise, integrated with your project

Harcon combines railway interface expertise with construction and engineering assurance capability. We work alongside client, design and delivery teams to manage Network Rail requirements, coordinate technical and construction interfaces and provide continuity from early project development through to delivery.

Asset Protection and interface management. Coordinating Network Rail requirements and assurance throughout the project.
Construction and engineering assurance. Supporting design, temporary works, construction methodology and work package assurance.
Operational railway assurance. Planning and managing access, Safe Systems of Work and operational controls for delivery.
Any Line Open planning and management. Developing, coordinating and assuring ALO arrangements from planning through to site delivery.
Integrated project support. Working alongside project teams from early engagement through construction and close out.
Rail infrastructure works in progress
Assurance through to site delivery
Combining railway interface management with construction and operational assurance, including the planning and management of ALO arrangements where required.
Case studies

Railway interface projects in practice

Examples of how we support third party projects through Network Rail Asset Protection, engineering and construction assurance, interface planning and site delivery.

Railway interface Crane lifting operations beside the operational railway at Beedles Lake, Leicester
Jelson Homes

Beedles Lake Padel Court, Leicester

The development of a new padel court at Beedles Lake presented a direct interface with Network Rail managed infrastructure. Harcon Solutions was engaged to provide railway interface project management, engineering and construction assurance, establishing and managing the project through Network Rail's technical and engineering assurance processes.

Railway InterfaceCEM/CRETemporary WorksALO
Read the case study
ASPRO interface New active travel route alongside the operational railway at RSPB Conwy
Jennings Building & Civil Engineering

RSPB Conwy Active Travel Route, North Wales

A new dual use pedestrian and cycle route, with approximately 200 metres running parallel to the operational railway and a new bridge carrying the route across it. What began as a commission for specialist Any Line Open planning and coordination developed into a wider Network Rail Interface Project Management and construction assurance role.

ASPRO InterfaceEngineering AssuranceALO Management
Read the case study
Questions

Frequently asked questions

Practical answers to common questions about Network Rail Asset Protection and third party railway interfaces.

What is Network Rail Asset Protection (ASPRO)?
Network Rail's Asset Protection and Optimisation (ASPRO) teams support third party organisations undertaking works on or near the operational railway. The process provides the framework for managing the engineering, construction and operational risks that proposed works may introduce to railway infrastructure and operations.

Where a project interfaces with the railway, early engagement with the relevant ASPRO team helps establish the requirements that need to be addressed through design, planning, assurance and construction delivery.
How do I know if my project requires Asset Protection engagement?
Asset Protection engagement may be required where proposed works are on, over, under or adjacent to the railway, or where construction activity could affect railway infrastructure or operations.

Typical interfaces include excavation, piling, lifting operations, temporary works, utilities, drainage, ground movement, vibration, work near overhead line equipment and access across or onto railway land. If there is potential for the works to affect the railway, early engagement should be considered.
When should we engage Network Rail Asset Protection?
As early as practicable. Railway interface requirements can influence design, construction methodology, programme, access and assurance arrangements. Early engagement allows these requirements to be identified and incorporated while the project still has the flexibility to respond to them.

Harcon can also support projects where the Asset Protection interface is already established or where engagement has commenced later in the programme.
What is the difference between a BAPA and an APA?
A Basic Asset Protection Agreement (BAPA) and Asset Protection Agreement (APA) are contractual arrangements used by Network Rail for third party works. The appropriate agreement depends on the nature and requirements of the project and is established through engagement with Network Rail.

Both provide arrangements for Network Rail's involvement in supporting and assuring the works, although the scope, responsibilities and commercial provisions will vary according to the agreement and project.
What information may Network Rail require for review and acceptance?
The information required will depend on the nature and stage of the project. It may include designs, engineering assurance information, construction methodologies, method statements, work package plans, temporary works information, monitoring proposals and details of access or operational railway arrangements.

Harcon coordinates the relevant submissions and associated assurance requirements with the project team and Network Rail.
Who is responsible for Network Rail's Asset Protection costs?
Network Rail may recover costs associated with the services and resources it provides in supporting third party works. The applicable charging and commercial arrangements depend on the agreement and requirements of the individual project.

Establishing these requirements early allows Network Rail costs and associated programme implications to be considered as part of project planning rather than emerging later in delivery.
Can Harcon support the wider engineering, construction and operational railway interface?
Yes. Our involvement can extend beyond Asset Protection interface management into construction and engineering assurance, temporary works oversight, work package assurance and rail interface planning.

Where required, we can also support access and possession planning, Safe Systems of Work and Any Line Open planning and management, providing continuity from project development through to site delivery.
Discuss your project

Planning works that interface with the railway?

Speak directly with Harcon about your project and railway interface requirements. We can help establish the appropriate Asset Protection, engineering, construction and operational assurance arrangements from early project development through to delivery.

Discuss your requirements Call 0800 3102 008
Call Email Talk to Harcon
Powered by AWMEDIA